Skip to main content

January Jump Start

While chatting with a friend at QATW, we got to talking about New Year's Resolutions and our growing piles of unfinished quilts. I proposed an idea to have a year long quilt-along for others to join me in trying to turn these UFOs (UnFinished Objects) into finished quilts. This friend then challenged me (in the midst of much teasing) to finish 12 quilts this year. If I could, she would send me 12 F4's. I accepted.

So, I scoured my shelves in the sewing room and came up with 21 UFOs. I really wanted to get a great jump start on this little challenge, so I put the easiest ones up front. It paid off - I finished 3 quilts in January.


Peter Rabbit - A panel that Brian's grandmother gave me when Arthur was born. It's only been 7 years, but it is now finished.


Let It Snow - This is a small wall hanging that I made as a swap at QATW. The theme was winter and I just loved these little snowmen. I did see this design on another blog, but I can't remember where, at the moment.


My House - These are house and tree blocks that were swapped at QATW last year. I just love how this one came out. This quilt is now on the recliner, ready to be used for those afternoon naps that I have come to love.

I doubt I'll get nearly this much done in February, but I'll be thrilled with one finished quilt next month. I've got 2 picked out to work on, so we shall see how it goes.

Veronica

Comments

Anna Kristine said…
Wow Veronica, I'm impressed! I would have been impressed by one finished quilt! :) Those snowmen are too cute! I have so many unfinished quilts in my project box...I'm scared to count them...okay I just did, I have 7. That doesn't sound too bad but 3 of them are Grandmother's flower garden quilts, all hand stitched, so those will take me forever. Maybe I should do a quilt challenge next year. :) Thanks for sharing your link! Now I'm inspired! Can't wait to see what you get done in February!

Popular posts from this blog

The Latest Finish

After many posts and a lot of work, the bookcase quilt if finally complete. It only lacks a label, but I'm waiting for instruction on what exactly should be on it. I really enjoyed making this quilt. It was a bit intimidating at first because I didn't have an actual pattern. In doing some web surfing, I did find someone who gave some general instructions on how to make the books. I'll have to work on making slanted books as those gave me the most difficulty. I felt like I was doing everything backwards and I never did seem to cut the fabric correctly. The quilting for the background came easy: a meander using black thread. On the shelving I used a tan in the top and black in the bobbin. I really struggled to find the right way to quilt the books and knickknacks on the shelves. After much thought and some discussion with a woman at the local fabric store, I decided to use invisible thread in the top and black in the bobbin and do stitch in the ditch (or outline) for...

The Running Elephant: Me

This week (Has it only been one week ? It feels so much longer!) I started training to run a 5K in November. I came across this site that claims it will take you from the very beginning (sitting on a couch) to running a 5K in just 9 weeks. It's called Couch to 5K and I began the program on Tuesday. Three days a week, I do interval training. Interval training is when you switch back and forth from walking to running. This week I run for 60 seconds and walk for 90 seconds, repeating that for 20 minutes. I did pretty well on Tuesday. I was winded and it took a while to recover my breathing and for the heat in my face to cool down. Thursday was a different matter. Brian and Arthur were gone overnight, so I had to take Abigail with me. Since I couldn't go down the stairs into the dry canyon with the stroller, I took the longer route which included a hill into the canyon. Going down the hill to get in was just fine. Turning around to come back, however, was a different...
Life is getting busy in the next couple of weeks.  I homeschool my children, but we are trying an online charter school.  That means that we kind of need to follow the school schedule.  I'll understand more details at a required orientation meeting next week.  And then the first day of school is September 6.  I do see that many of my friends across the country have already started sending their kids to school 2 and 3 weeks ago.  I just couldn't bring myself to do that.  August is still summer break! This week I interviewed with JoAnn's Fabrics to be an instructor for their classes.  They were very pleased with samples of my work and pretty excited that I could cover nearly all the fiber arts - sewing, quilting, crochet, and knitting.  My background check went through pretty quickly and I'm going in tomorrow to talk to them about upcoming knitting classes they'd like me to teach.  Time to remind myself of the different cast on techniques!...